July 2010
Risen Christ Screen Design
Liturgical Furnishings
F-Line Soil Report
May 2010
Baptismal Font Design RFP
Canopy Model Design
Canopy RFP
Interior Design for the Church
April 2010
Indoor Air Quality Report
November 2009
Views of the Church Interior (25.5 mb)
August 2009
Monument Sign Draft
July 2009 Spirit II, Final Architectural and Structural Specifications Construction Bid Documents - 6-29-09
Spirit II, Architectural Drawings Construction Bid Documents - 6-29-09
Spirit II, Structural Drawings Construction Bid Documents - 6-29-09
Spirit II, Mechanical Drawings Construction Bid Documents - 6-29-09
Spirit II, Electrical Drawings Construction Bid Documents - 6-29-09
May 2009
Spirit II Concrete Foundation & Slab Plan
Spirit II Concrete Foundation & Slab Sections
TVA's predictive energy use analysis report
BCDM LEED energy simulation report
April 2009
Exterior Perspective from the North
Exterior Perspective from the South
Interior Perspective from the North
Interior Perspective from the South
Phase II Document Narrative
Phase II Design part 1, pages: 1,2,3,4,5,6,7,8
Phase II Des gin part 2, pages: 1,2,3,4,5,6,7,8,9,10
Acoustic Design Report
March 2009
Force Main Easement Plot
January 2009
General and Civil Drawings: 1, 2, 3, 4, 5
Architectural Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17
Structural Drawings: 1, 2, 3, 4, 5, 6, 7
Mechanical Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
Plumbing Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9
Electrical Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9
Spirit I & II Perspective
Spirit I & II Composite Plan
Conductivity Test Well Report
December 2008
Spirit II Schematic Design
Spirit II Schematic Design (drawings, 4MB pdf) Parkside Building Plan 2008 (5.5MB pdf)
October 2008 Work Site Building Permit (7mb) Spirit I & II Floor Plan Design
Force Main
Cover, page 1, page 2, page 3, page 4/4
September 2008 Site Development Plans Model 1/15 Model 2/15 Model 3/15 Model 4/15 Model 5/15 Model 6/15 Model 7/15 Model 8/15 Model 9/15 Model 10/15 Model 11/15 Model 12/15 Model 13/15 Model 14/15 Model 15/15 ______________________________ MECHANICAL SCHEMATIC DESIGN INTENT NARRATIVE Geo Thermal DIRECT DIGITAL CONTROL SYSTEM Holy Spirit HVAC Equipment matrix
August 2008 Amended Parkside Traffic Study Parkside Offsite Improvements
Floor Plan
Enlarged Plans
Reflected Ceiling Plan
Architectural Design Development Plan
Mechanical Design Development Plan
Structural Design Development Plan
Image A
Image B
Image C
Image D
Image E
Image F
Image G
May 2008
Approved Schematic Design Site and Floor Plans Spirit I Site Rectory Kitchen Area Office Area Parish Hall Religious Educational Area I Religious Educational Area II Total Spirit I Areas
April 2008
Spirit I Building Plan
Traffic Study Letter