Header image  
 
Design

July 2010

Risen Christ Screen Design

Liturgical Furnishings

F-Line Soil Report


 

May 2010

Baptismal Font Design RFP

Canopy Model Design

Canopy RFP

Interior Design for the Church


April 2010

 

Indoor Air Quality Report


 

November 2009

Views of the Church Interior (25.5 mb)

 


 

August 2009

Monument Sign Draft



July 2009

Spirit II, Final Architectural and Structural Specifications Construction Bid Documents - 6-29-09

Spirit II, Architectural Drawings Construction Bid Documents - 6-29-09

Spirit II, Structural Drawings Construction Bid Documents - 6-29-09

Spirit II, Mechanical Drawings Construction Bid Documents - 6-29-09

Spirit II, Electrical Drawings Construction Bid Documents - 6-29-09


 

May 2009

Spirit II Concrete Foundation & Slab Plan

Spirit II Concrete Foundation & Slab Sections

TVA's predictive energy use analysis report

BCDM LEED energy simulation report


 

April 2009

Exterior Perspective from the North

Exterior Perspective from the South

Interior Perspective from the North

Interior Perspective from the South

Phase II Document Narrative

Phase II Design part 1, pages: 1,2,3,4,5,6,7,8

Phase II Des gin part 2, pages: 1,2,3,4,5,6,7,8,9,10

 

Acoustic Design Report

 


 

 

March 2009

Force Main Easement Plot

 




January 2009

General and Civil Drawings: 1, 2, 3, 4, 5

Architectural Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17

Structural Drawings: 1, 2, 3, 4, 5, 6, 7

Mechanical Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12

Plumbing Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9

Electrical Drawings: 1, 2, 3, 4, 5, 6, 7, 8, 9


Spirit I & II Perspective

Spirit I & II Composite Plan

Conductivity Test Well Report

 


December 2008

Spirit II Schematic Design

Spirit II Schematic Design (drawings, 4MB pdf)

Parkside Building Plan 2008 (5.5MB pdf)



October 2008

Work Site Building Permit (7mb)

Spirit I & II Floor Plan Design

Force Main

Cover, page 1, page 2, page 3, page 4/4




September 2008


Site Development Plans


Model 1/15
Model 2/15
Model 3/15
Model 4/15
Model 5/15
Model 6/15
Model 7/15
Model 8/15
Model 9/15
Model 10/15
Model 11/15
Model 12/15
Model 13/15
Model 14/15
Model 15/15

______________________________

MECHANICAL SCHEMATIC DESIGN INTENT NARRATIVE


Geo Thermal DIRECT DIGITAL CONTROL SYSTEM

Holy Spirit HVAC Equipment matrix



August 2008

Amended Parkside Traffic Study

Parkside Offsite Improvements

Floor Plan

Enlarged Plans

Reflected Ceiling Plan

Architectural Design Development Plan

Mechanical Design Development Plan

Structural Design Development Plan

Image A

Image B

Image C

Image D

Image E

Image F

Image G


May 2008

Approved Schematic Design Site and Floor Plans

Spirit I

Site

Rectory


Kitchen Area


Office Area


Parish Hall


Religious Educational Area I


Religious Educational Area II


Total Spirit I Areas

April 2008


Approved Site Layout Plan


Spirit I Building Plan

 


March 2008

Traffic Study Letter